Equipment installation, November 2015.

The most important part of the process of building a farm it is equipment installation. Over the past month since the beginning of the installation much has been done: built and placed pools, installed mechanical filters and oxygen cones, mounted pumps and part of the pipeline.

pump installation in small room

Pumps installation in small room

pipeline (pool and cones)

Pipeline to cones and pool

pipeslines above the pools in small room(doen't connected)

Pools and pipeline in small room

connected pumps with  big skimmer

Skimmer connected to pumps (Big room)

connected drum fillters and small pumps

Drum filters

connected ozonegenerator in small room and installed pumps

Сonnected ozonegenerator in small room and pumps

Pump connections in small room

Installed pumps (small room).